New build · Augsburg-Haunstetten
New build of an apartment building with day-care centre in Augsburg-Haunstetten
- Reference
- #03
- Location
- Augsburg-Haunstetten
- Measure
- New build
- Scale
- 25 residential units + day-care centre
- Service phases
- LP 1–5
The building and its services
Drag to orbit (also below the floor) · middle button to pan · wheel/pinch to zoom · + / − keys
Building volume from plan dimensions, services schematic – Heating, Plumbing, Electrical engineering, Ventilation.
Trades
Choose a trade to highlight it
Equipment
- Heat pump
- Photovoltaics
- Wallbox
- Ventilation with heat recovery
Model from plan dimensions (rounded).
Project description
The new building has five storeys with 25 apartments and a day-care centre on the ground floor and is located in Augsburg-Haunstetten. Heat generation is designed with an air-to-water heat pump plus gas back-up. The heat is delivered via underfloor heating. The central ventilation plant for the day-care centre is designed with heat recovery, while the apartments are served by decentralised ventilation units. The apartments are designed to HEA equipment level 2 (RAL-RG 678). EV charging points are provided as pre-installation. In addition, a photovoltaic system is designed for the day-care centre. A lighting calculation for the underground car park is prepared to DIN EN 12464-1.
Design challenge
Mixed use of apartments and a day-care centre with separate building services systems
Technical highlights
- Heat pump + gas
- Day-care centre ventilation with heat recovery
- Decentralised apartment ventilation
- PV system for the day-care centre
Construction details