Meglingerstraße 64/II · 81477 München
Phone +49 89 411 1439-0 · Fax +49 89 411 1439-99
info@san-tga.de · demo.san-tga.eu
Laid out for A4. In the browser's print dialog you can choose "Save as PDF" – also via Ctrl + P.
Reference sheet · #05
New build of an apartment building in Gersthofen near Augsburg
Project data
- Reference
- #05
- Location
- Gersthofen (Lkr. Augsburg)
- Measure
- New build
- Building type
- Apartment building
- Scale
- 80 residential units
- Service phases
- LP 1–9 under HOAI § 55
- Cost groups (DIN 276)
- 410 · 420 · 430 · 440 · 450 · 480 DIN 276 structures construction costs into cost groups; the 400 series covers a building's technical installations.
Trades designed
Electrical engineering · Ventilation · Plumbing · Heating
Project description
The new building has four storeys with 80 apartments and is located in Gersthofen in the district of Augsburg. Heat generation for the communal areas is designed with a fuel cell plus a gas condensing boiler. The power supply for the communal areas is provided by a fuel cell. The heat is delivered to the individual rooms via underfloor heating. The apartments are designed to HEA equipment level 1 (RAL-RG 678). In view of the energy transition, EV charging points are provided as pre-installation for the tenants. In addition, a photovoltaic system of up to 200 m² is provided. A lighting calculation for the underground car park is prepared to DIN EN 12464-1.
Design challenge
Energy concept for 80 residential units with a fuel cell supply
Technical highlights
- Fuel cell + gas
- PV system up to 200 m²
- EV charging infrastructure
- DIN EN 12464-1 underground car park